The High-line and High-bar EPC Project of KADERMIR in Turkey

Mar 26,2025


We provide all the equipment and electrical control systems from the heating furnace to the bundling and collection area. This project is Turkey's first composite production line, with an annual production capacity of nearly 2000,000 tons.

Project Features

The KADERMIR high-line and high-bar EPC project in Turkey adopts the heating of steel billets with a heating furnace and features a shared post-roughing and intermediate rolling mill AB composite line design. We provide all equipment and electrical control systems from the heating furnace to the bundling and collection area. This project is Turkey's first composite production line, with an annual production capacity of nearly 2000,000 tons.